Interconnection Runs Longer Than Anything Else on a BESS Project. Manage It That Way.
Interconnection is the longest-running workstream in BESS development. It starts before the land is signed, and it is still open when the battery equipment is selected. Along the way it carries filing windows, cure periods, study deposits, security postings, and decision points where the right answer may be to withdraw.
Most development teams carry this alongside everything else. The deadlines live in an inbox. The study reports arrive as engineering documents, not as decisions. A late equipment change can put the queue position at risk, and nobody sees it until the ISO does.
Carina manages BESS interconnection on the owner’s side, from choosing where to connect through protecting the queue position during development. Every deadline, deposit, study, and decision sits in one place, under an interconnection lead who has run these studies himself and has worked both the utility side and the developer side of the process.